
I found these “Flint by Foot” maps by The Greenway Collaborative to be interesting as a point in time image of what Downtown looked like and how opportunities were presented before the Great Recession and before the Flint Water Crisis. Walking across Downtown from Kettering to Mott Park past UM Flint campus was estimated to take 45 minutes.

Leave a comment